Contact Us
Facilities Management
4400 Massachusetts Avenue NW
Washington, DC 20016-8057
United States
- (01 General Requirements Continued)
- 01 40 00 Quality Requirements
- 01 42 00 References
- 01 50 00 Temporary Facilities and Controls
- 01 60 00 Product Requirements
- 01 73 00 Execution
- 01 77 00 Closeout Procedures
- 01 78 23 Operation and Maintenance Data
- 01 78 39 Project Record Documents
- 01 79 00 Demonstration and Training Requirements
- 01 91 13 General Commissioning Requirements
- 02 Existing Conditions
- 03 Concrete
- 04 Masonry
- 05 Metals
- 06 Composites, Plastics, and Wood
- 07 Thermal and Moisture Protection
- 08 Openings
- 09 Finishes
- 10 Specialties
- 11 Equipment
- 12 Furnishings
- 13 Special Construction
- 14 Conveying Systems
- 15 Mechanical
- 16 Electrical
- 21 Fire Suppression
- 22 Plumbing
- 23 Heating, Ventilating, and Air Conditioning
- 25 Integrated Automation
- 25 00 08 Integrated Automation Commissioning
- 25 11 13 Integrated Automation Network Servers
- 25 14 13 Remote Control Panels
- 25 15 16 Software for Control aand Monitoring Devices
- 25 35 00 Instrumentation and Terminal Devices for HVAC
- 25 35 13 Actuators and Operations
- 25 35 16 Sensors and Transmitters
- 25 35 19 Control Valves
- 25 55 00 Contol of HVAC
- 25 55 00. 13 Control of Object Naming Convention
- 25 95 00 Control of Sequences for HVAC
- 26 Electrical
- 27 Communications
- 28 Electronic Safety and Security
- 31 Earthwork
- 32 Exterior Improvements
- 33 Utilities
- Appliance and Electronic Standard (Residence Halls)
- AU Electrical Labeling Color Scheme
- AU Site Design Standards
- BAS Drawings and Control Sequences
- Cx Plan Customization Guide
- Equipment Numbering Scheme
- FM Equipment Asset ID Schemas
- FM Facilities Designations
- FM Piping Color Code
- FM Space Needs
- Process for Activities or Interruptions
- Space Numbering Guidelines
- Strategic and Operational Master Plans
- Changes and Version History
- Archives